Project Name: NORTH RUMAILA GTU-GAS STATION  

Location: IRAQ / BASRA  

Services: TROUBLESHOOTING, COMMISSIONING & OPERATION  

Customer: BGC 

Client: SOC 

DATE: 2021

Providing  technical  and  skilled  man  power  for  project  construction  and 

commissioning scpoe .

Project Name: SAMAWA PS2GAS STATION (STRATIGY LINE) 

Location: IRAQ / SAMAWA 

Services: TROUBLESHOOTING, COMMISSIONING & OPERATION  

Customer: LSA GROUP 

Client: MOE 

Date: 2021

Project Name: TMC POWER PLANET  

Location: IRAQ / BAGHDAD  

Services: PROCURMENT , ENGINEERING , CONSTRUCTION ,COMMISSIONING   

Customer: RCMC  

Client: RCMC  

Date: 2021

» Project steell structue engineering design,according to system  requirment

» steel structure construction ,welding ,painting .

» 160 m cable tray installation .

» 11kv cables pulling & joints fabrication 

»  HV tests for all power system .

Project Name: BASMAYA WATER INJECTION SUBSTATION   

Location: IRAQ / BAGHDAD 

Services: TESING,COMMISSIONING&OPERATION   

Customer: TEFEROM  

Client: MASS GROUP

Date: 2021

Project Name: TMC POWER PLANET  

Location: IRAQ / BAGHDAD  

Services: POWER SYSTEM TESTING (102 MW LOAD TEST) 

Customer: RCMC  

Client: RCMC  

Date: 2021

»  Provide complete load bank pachage for 12 MAN 8.7 Mw diesel Granerator.

» providing the operators & technical troubleshooting advicement to attempt  the test.

Project Name: TEL AWENAT 132/33KV GIS SUBSTATION   

Location: IRAQ / MOUSEL   

Services: TESING,COMMISSIONING&OPERATION   

Customer: KUNTROLMATIK   

Client: GE 

Date: 2021

»  132KV GIS SYSTEM PRE COMISSIONING,COMISSIONING AND OPERATION. 

» 132/33KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION . 

» EARTHING TRANSFORMER 33/0.4 KV TESTING AND OPERATION . 

» 33KV GIS SWITHGEAR CONTROL CABLES INSTALLATION ,TESTING ANS 

ENERGIZING . 

» PROTECTION SYSTEM SETTING CONFIGRATION , TESTING AND ENERIZING. 

» OUT DOOR CTS, VTS ,SURG ARRESTER TESTING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY. 

» FINAL ENERGIZING BY NATIONAL GRID TILL HAND OVER.Project Name: TEL AWENAT 132/33KV GIS SUBSTATION   

Location: IRAQ / MOUSEL   

Services: TESING,COMMISSIONING&OPERATION   

Customer: KUNTROLMATIK   

Client: GE 

Date: 2021

»  132KV GIS SYSTEM PRE COMISSIONING,COMISSIONING AND OPERATION. 

» 132/33KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION . 

» EARTHING TRANSFORMER 33/0.4 KV TESTING AND OPERATION . 

» 33KV GIS SWITHGEAR CONTROL CABLES INSTALLATION ,TESTING ANS 

ENERGIZING . 

» PROTECTION SYSTEM SETTING CONFIGRATION , TESTING AND ENERIZING. 

» OUT DOOR CTS, VTS ,SURG ARRESTER TESTING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY. 

» FINAL ENERGIZING BY NATIONAL GRID TILL HAND OVER.

Project Name: AL-TABADUL 132/33KV AIS SUBSTATION   

Location: IRAQ / MOUSEL   

Services: TESING, COMMISSIONING&OPERATION   

Customer: KUNTROLMATIK   

Client: GE 

Date: 2021

» 132KV GIS SYSTEM PRE COMISSIONING,COMISSIONING AND OPERATION. 

» 132/33KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION . 

» EARTHING TRANSFORMER 33/0.4 KV TESTING AND OPERATION . 

» 33KV GIS SWITHGEAR CONTROL CABLES INSTALLATION ,TESTING ANS 

ENERGIZING . 

» PROTECTION SYSTEM SETTING CONFIGRATION , TESTING AND ENERIZING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY. 

» FINAL ENERGIZING BY NATIONAL GRID TILL HAND OVER

Project Name: ADAYYA 132/33KV AIS SUBSTATION   

Location: IRAQ / MOUSEL   

Services: TESING, COMMISSIONING&OPERATION   

Customer: KUNTROLMATIK   

Client: GE 

Date: 2021

» 132KV GIS SYSTEM PRE COMISSIONING,COMISSIONING AND OPERATION. 

» 132/33KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION . 

» EARTHING TRANSFORMER 33/0.4 KV TESTING AND OPERATION . 

» 33KV GIS SWITHGEAR CONTROL CABLES INSTALLATION ,TESTING ANS 

ENERGIZING . 

» PROTECTION SYSTEM SETTING CONFIGRATION , TESTING AND ENERIZING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY. 

» FINAL ENERGIZING BY NATIONAL GRID TILL HAND OVER.

Project Name: ALKEFL 132/33KV GIS SUBSTATION   

Location: IRAQ / HILLA   

Services: TESING, COMMISSIONING&OPERATION   

Customer: ALSAMI    

Client: SIEMENS  

Date: 2021-2022

» 132KV GIS SYSTEM PRE COMISSIONING,COMISSIONING AND OPERATION. 

» 132/33KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION . 

» EARTHING TRANSFORMER 33/0.4 KV TESTING AND OPERATION . 

» 33KV GIS SWITHGEAR CONTROL CABLES INSTALLATION ,TESTING ANS 

ENERGIZING . 

» PROTECTION SYSTEM SETTING CONFIGRATION , TESTING AND ENERIZING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY.

Project Name: AL-KESK 400/132KV GIS SUBSTATION   

Location: IRAQ / MOUSEL   

Services: TESING, COMMISSIONING&OPERATION      

Customer:  GE 

Client: MOE   

Date: 2021

» 400KV GIS SYSTEM PRE COMISSIONING, COMISSIONING AND OPERATION. 

» 400/132KV TRANSFORMR CABLES INSTALLATION AND TESTING. 

» CAPACITOR BANK TESTING AND OPERATION. 

» 132KV GIS SWITHGEAR CONTROL CABLES INSTALLATION, TESTING AND 

ENERGIZING. 

» PROTECTION SYSTEM SETTING CONFIGRATION, TESTING AND ENERIZING. 

» HV RESONANCE TEST 230 KV AC. 

» OUT DOOR EQUIPEMENTS TESTING. 

» COMPLETE SUBSTATION FUNCTIONAL TEST& OPERATION ACCORDING TO 

SYSTEM TOPOLOGY.

Project Name: AFAM POWER PLANET   

Location: NIGERIA  

Services: SIEMENS GAS TURBINE GENERATOR INSTALLATION, AND 

COMMISSIONING.        

Customer:  TMC 

Client: TRANS POWER  

Date: 2022

» Turbine inspection and preparation for rotor pull out of generator for 

maintinance. 

» Generator rotor inspection due to ultrasonik ,electrical tests.

» Generator stator winding inspection  preparation for maintinance .

» Generator stator cleaning . 

» Generator stator winding factory procedure maintinace.

» Generator stator testing . 

» Perform the turbine blade inspection and prepare all system for commissioning 

» Perform the maintenance and testing documents. 

» Turbine hand over to client.

Project Name: AL NOOR 132/33KV GIS SUBSTATION 

Location: IRAQ / MOUSEL   

Services: SUBSTATION CIVIL CONSTRUCTION     

Customer:  POWER TEAM COMPANY 

Client: MOE   

Date: 2020-2021

Substation Civil Works including Control Room & Office Building,  Foundations, 

Drainage System, Water Harvesting System, Trenches, Roads &    Inspection 

Pathways, Boundary Wall, Fencing, Water Supply arrangement,   Residential 

Accommodation for Operating Staff, Security Guard room,   Stores/ Maintenance 

Workshop etc.